Measured vertical clearance

Minimum added height for a keg on the compressor hump

Enter four measurements in one unit. The result is the vertical deficit between the current closed-lid clearance above the hump and the vessel height plus your requested overhead clearance.

Result

No calculation run yet

All values stay in this browser tab.

Formula

minimum added height = max(0, hump height + vessel height + top clearance − current inside height)

Equivalently, current height above the hump is inside height − hump height. The tool compares that space with vessel height + top clearance. It does not add a construction allowance or round the result up.

What to measure

  1. Measure current inside height to the lowest closed-lid obstruction.
  2. Measure the hump height from the same main-floor reference.
  3. Measure the vessel's complete installed height, including posts, fittings or lid parts that remain attached.
  4. Choose an overhead clearance deliberately and keep all four values in one unit.

Vertical arithmetic is not a collar design

The number does not establish structural, sealing, condensation, hinge, electrical, refrigeration, drilling, pressure or gas-routing safety. It also says nothing about whether the vessel's circular footprint fits on the hump. Check that separately with the measured-layout checker.